
DATE: 24.04.2018
IMPORTANT: Throughout this guide, dimensions may vary by ±2mm (1/16'').
Read the installation guide for detailed information on installing the product.
For full installation instructions and specifications visit fisherpaykel.com
CAVITY PREPARATION
6" Professional Range
0 5 10 20
g
RDV models
f b
FINAL POSITION OF
RANGE AGAINST WALL
ELECTRICAL & GAS
RGV models
c d
e b
a
a
FINAL POSITION OF
RANGE AGAINST WALL
ELECTRICAL
GAS
inches
Model no:
RGV2-364GD-N, RGV2-364GD-L
RDV2-364GD-N, RDV2-364GD-L
Location of Electrical and Gas Supply
A Depth of supply area (ie maximum protrusion of
gasconnection from wall)
B Distance from right hand edge of range to supply area
C (RGV) Height of electrical supply area (from floor)
D (RGV) Height of gas supply area (from floor)
E (RGV) Width of supply area
F (RDV) Distance from left hand edge of range to supply area
G (RDV) Height of electrical and gas supply area (from floor)
Specifications
Electrical
Supply
Max. Current Draw
Service
Electrical
Supply
Max. Current Draw
Service
Gas – Natural
Connection
1/2” NPT Minimum 5/8” dia. flex line
Supply Pressure
Supply Pressure: 6” to 9” W.C.
Gas – LP
Connection
1/2” NPT Minimum 5/8” dia. flex line
Supply Pressure*
A regulator is required at the LP source to provide a maximum pressure
of 14” W.C. to the range regulator.
Comments to this Manuals