Fisher Paykel DD24DCTX9N Installation Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
4
3 OPTIONALLY HARD WIRING PRIOR TO INSTALLATION
IMPORTANT!
Ensure the mains wires are routed
UNDERNEATH all other harness
wiring from the electronics module.
3-D REFIT THE DRAWER ONTO THE RUNNERS & CLOSE
3-C TERMINATE MAINS WIRING AS SHOWN AND REPLACE MODULE AND COVERS
4” (100 mm)
Pull the release tabs forward on both
sides 4” (100 mm). Ensure the tabs are
fully pulled forward and click into place.
8
9
10
11
12
13
14
8 Fit a suitable cable clamp for the
conduit through the metal knockout.
Ensure wiring is routed through or
under under housing ribs.
9 Screw down the Live, Neutral and
Earth wires correctly.
10 Push the plastic harness cover back
over. It should clip back into place
11 Fold down and slide back the
terminal block cover.
12 Refit the electronics module back
into position, being careful of wiring.
13 Replace the screw securing the
electronics module.
14 Slide the access cover back,
ensuring the 2 clips shown are fully
locked in place.
NOTE: Use copper conductors
only.
1
2
3
4
Before refitting the
drawer, ensure the hoses
are not twisted and the
latches at the rear of
each drawer runner are
facing forward.
Lift or rotate counter-clockwise the
drawer back onto the drawer runners
on either side.
Release tab
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 39 40

Comments to this Manuals

No comments