Fisher Paykel OR30SDE6X1 Installation Guide Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
15
!4ELECTRICAL CONNECTION
PERMANENT CONNECTION (HARD WIRING)
US only, for Canada it is mandatory to connect
the range by using cordset with plug supplied.
Units may be hard wired to the power supply. The
installer must provide approved flexible aluminium
conduit, 3/4” (19mm) trade size, maximum 6ft (1.8m)
long. Locate the terminal block on the rear of the unit
and remove access cover.
The strain relief bracket orientation must be switched
in order to accommodate for a permanent wiring
connection:
1 Remove the factory supplied power cord with plug.
2 Remove the 2 screws on the bracket.
3 Re-secure bracket with the 2 screws so that the
1 1/8” (29mm) smaller opening is facing down.
The conduit must be installed to the terminal block using
an approved conduit connector. The free end of the
conduit must be connected to a junction box provided in
the electrical supply zone.
Mount a strain relief (not provided) into the 1 1/8”
(29mm) diameter hole located below the terminal block.
Wiring for the unit is to be brought into the terminal
block through the conduit and through the strain
relief. Make suitable connections to the terminal block
provided.
Installer — Show the owner the location of the circuit
breaker. Mark it for easy reference.
4-Wire Connection
1 Loosen the L1 (red), L2 (black) and neutral (white) screws.
2 Mount the conduit fitting to the 1 1/8” (29mm) hole in the
strain relief bracket.
3 Secure the neutral (white) power lead to the center
terminal and tighten the screw.
4 Secure the L1 (red) and the L2 (black) power leads to the
terminals immediately to the left (L1) and right (L2) of the
neutral terminal. Tighten the screws.
5 Secure the Ground (green) lead to the green screw
located to the right of the terminal block using the
supplied cupped washer. The end of the grounding
conductor must be retained by the cupped washer.
6 Check all connections are securely tightened.
7 Reinstall the Terminal Block cover.
3-Wire Connection (using supplied Ground lead)
1 Loosen the L1 (red), L2 (black) and neutral (white)
screws.
2 Mount the conduit fitting to the 1 1/8” (29mm) hole in
the strain relief bracket.
3 Secure the supplied Ground (green) lead to the
grounding screw to the right of the terminal block.
4 Secure the Neutral (white) power lead together with
the free end of the Ground (green) lead to the center
terminal. Tighten the screw.
5 Secure the L1 (red) and the L2 (black) power leads
to the terminals immediately to the left (L1) and right
(L2) of the neutral terminal. Tighten the screws.
6 Check all connections are securely tightened.
7 Reinstall the Terminal Block cover.
1 23
Terminal Block
Strain relief bracket Smaller opening
PENL1 L2
NL1 L2
PE
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 31 32

Comments to this Manuals

No comments